Grants and Contributions
About this information
In June 2016, as part of the Open Government Action Plan, the Treasury Board of Canada Secretariat (TBS) committed to increasing the transparency and usefulness of grants and contribution data and subsequently launched the Guidelines on the Reporting of Grants and Contributions Awards, effective April 1, 2018.
The rules and principles governing government grants and contributions are outlined in the Treasury Board Policy on Transfer Payments. Transfer payments are transfers of money, goods, services or assets made from an appropriation to individuals, organizations or other levels of government, without the federal government directly receiving goods or services in return, but which may require the recipient to provide a report or other information subsequent to receiving payment. These expenditures are reported in the Public Accounts of Canada. The major types of transfer payments are grants, contributions and \'other transfer payments\'.
Included in this category, but not to be reported under proactive disclosure of awards, are (1) transfers to other levels of government such as Equalization payments as well as Canada Health and Social Transfer payments. (2) Grants and contributions reallocated or otherwise redistributed by the recipient to third parties; and (3) information that would normally be withheld under the Access to Information Act and the Privacy Act.
$15,000.00
Feb 2, 2024
For-profit organization
-
FR-27046
Develop digital adoption plan
$15,000.00
Feb 2, 2024
For-profit organization
-
FR-27056
Develop digital adoption plan
$15,000.00
Feb 2, 2024
For-profit organization
-
FR-27163
Develop digital adoption plan
$14,175.00
Feb 2, 2024
For-profit organization
-
FR-27241
Develop digital adoption plan
$12,509.10
Feb 2, 2024
For-profit organization
-
FR-27266
Develop digital adoption plan
$48,295.00
Feb 2, 2024
A redesigned school zone to encourage active mobility for Candiac schoolchildren
-
"The objective of the project is to encourage students attending the three partner schools and their parents to change their mode of transportation and stop driving in the school zone around Fernand Séguin Park.
Mobilization to use active transportation is essential to maximize stakeholder engagement. Consequently, the project includes the following: the design of three maps identifying preferred school routes for active transportation on a daily basis, and drop-off zones to encourage parents to stop driving in the school zone; participation by the school board, the three partner schools and the Intermunicipal Police Board in the implementation of safe school routes; posting of the three maps on the Town’s Internet accounts and transmission to schools for inclusion in school materials (e.g., agendas); meeting with the three schools to identify promotion methods and how to implement them.
The Town also plans to prepare concrete plans that technically and graphically describe the development and improvement of active transportation networks; it will also prepare detailed cost estimates. The plans will provide attractive, safe facilities that support active travel year-round.
Funding from the Active Transportation Fund is critical. It will bring together all the key elements required to ensure safe and active mobility in this school zone. The Town will also have access to external studies."
$50,000.00
Feb 2, 2024
Drummondville Feasibility study - Rivia Multiuse Parkway, Phase 3
-
"The project involves assessing the lowest-impact route for the extension of the Promenade Rivia walking/cycling path along the Saint-François River in Drummondville between Voltigeurs Park and the Saint-Joachim district.
Description of the concept:
• The path will integrate as harmoniously as possible with the surroundings, while making the most of the proximity of the river
• The path will be multifunctional and suited to all types of users
• The surface will be paved to a width of 3.0 m, with wood on the footbridges
• For safety and comfort, street crossings will be minimized, and the route will be physically “protected” when it is located along a roadway
The route will be on the east bank of the Saint-François River between downtown Drummondville and the Saint-Joachim-de-Courval district.
There will be three main sections:
1. Promenade Rivia between the Traverse Bridge (University Boulevard) and the Highway 20 overpass, Phase 1 completed in 2018
2. Trail in Voltigeurs Park, the most recent phase, completed in the summer of 2021
3. Waterfront sections (3.1, 3.2 and 3.3) between Voltigeurs Park and the Saint-Joachim-de-Courval district, which are the subject of this application"
$199,100.00
Feb 2, 2024
Government
Path to net-zero energy ready (NZER) buildings in Whistler, British Columbia
FR-00581
This project is to improve energy efficiency in Canada's residential, commercial, and institutional building sector.
$199,100.00
Feb 2, 2024
Government
Path to net-zero energy ready (NZER) buildings in Whistler, British Columbia
FR-00581
This project is to improve energy efficiency in Canada's residential, commercial, and institutional building sector.
$500,000.00
Feb 2, 2024
Aboriginal recipient
Uchucklesaht Climate Action Plan
CERRC-DM-G10
This project is mostly related to encouraging the adoption of clean technologies.