Grants and Contributions
About this information
In June 2016, as part of the Open Government Action Plan, the Treasury Board of Canada Secretariat (TBS) committed to increasing the transparency and usefulness of grants and contribution data and subsequently launched the Guidelines on the Reporting of Grants and Contributions Awards, effective April 1, 2018.
The rules and principles governing government grants and contributions are outlined in the Treasury Board Policy on Transfer Payments. Transfer payments are transfers of money, goods, services or assets made from an appropriation to individuals, organizations or other levels of government, without the federal government directly receiving goods or services in return, but which may require the recipient to provide a report or other information subsequent to receiving payment. These expenditures are reported in the Public Accounts of Canada. The major types of transfer payments are grants, contributions and \'other transfer payments\'.
Included in this category, but not to be reported under proactive disclosure of awards, are (1) transfers to other levels of government such as Equalization payments as well as Canada Health and Social Transfer payments. (2) Grants and contributions reallocated or otherwise redistributed by the recipient to third parties; and (3) information that would normally be withheld under the Access to Information Act and the Privacy Act.
$65,667.00
Jun 8, 2026
For-profit organization
Development of a 20V3 container and its compactor.
1043669
Development of a method and equipment for optimizing container collection.
$75,000.00
Jun 8, 2026
For-profit organization
Compliance Agent
1043718
Develop conversational interface on Software as a Service (SaaS) platform, enabling aviation operators to query emissions and related Sustainable Aircraft Fuel (SAF) compliance data across numerous regulatory frameworks.
$99,000.00
Jun 8, 2026
Academia
An Integrated Battery Diagnostic System (iBDS) for Fast and Scalable Battery Health Assessment
1043602
Electric vehicle adoption and battery second-life applications require efficient tools for battery degradation monitoring and state-of-health estimation. Electrochemical Impedance Spectroscopy (EIS) is widely used for this purpose; however, University of Windsor research has identified a critical limitation in conventional measurements: open?circuit-voltage (OCV) induced bias can distort impedance estimates, particularly at low frequencies. The Project will advance a corrected EIS excitation and analysis method that combines a tailored excitation waveform with an observation model to estimate and remove the OCV contribution from the measured response. Initial proof-of-concept experiments have demonstrated feasibility at TRL 3. The Project will advance the technology to TRL 4 through systematic laboratory validation, benchmarking against conventional EIS, and evaluation across different cells, chemistries, states of charge, and measurement conditions. The NRC will conduct parallel validation and contribute to documenting the methodology and results.
$150,000.00
Jun 8, 2026
For-profit organization
Development of an Automatic Spa Water Treatment System
1044112
Development of a Fully Automatic Spa Water Treatment System
$40,000.00
Jun 8, 2026
For-profit organization
Containerized Microgrid Interface Unit
1044238
Consolidation and assessment of existing design information to develop a standard baseline ‘starter’ design for a containerized smart grid system centered on a Microgrid Interface Unit (MIU).
$30,000.00
Jun 8, 2026
For-profit organization
Youth - Cell Biology
1044399
Youth - Cell biology
$30,000.00
Jun 8, 2026
For-profit organization
Youth - Technical support
1044401
Youth - Technical support
$3,660,000.00
Jun 8, 2026
Government
Creation of a Réseau Express Vélo (REV) cycle path on Henri-Bourassa between Saint-Firmin Street and Ave des Récollets
-
The City of Montreal’s project involves conducting a feasibility study to identify the most significant issues and the preferred development scenarios.
$3,660,000.00
Jun 8, 2026
Government
Construction of a Bicycle Lane for the Réseau Express Vélo (REV) on Henri-Bourassa between Marcelin Wilson Ave and Lajeuness Street in Montreal
-
The City of Montreal's project includes both planning and capital works.
The planning work consists of conducting a feasibility study to determine the most important issues and the preferred development scenarios. Once a scenario has been selected, an estimate of the costs of Class D works will be carried out.
$2,460,000.00
Jun 8, 2026
Government
Development of an inter-district bike path on Hochelaga Street between Du Havre Street and Desjardins Avenue
-
The City of Montreal's project includes both planning and capital works.The planning work consists of conducting a feasibility study to determine the most important issues and the preferred development scenarios.