Grants and Contributions:
The project will increase the capacity of the existing 900 mm wastewater trunk system on Bayne street to support projected growth, and increas the size of the existing 900 mm
stormwater trunk system on Lady Hammond Road, Kempt Road and Bayne Street to accommodate increased flows resulting from upstream sewer separation initiatives. To enhance system performance and resilience, a new pressure-reducing valve (PRV) station will be constructed to provide additional operational flexibility within the water distribution system with distribution piping. The project also includes the replacement of a section of a critical 900 mm North End Feeder (NEF) water transmission main, ensuring the continued reliability of water service for both existing and future customers within Peninsular Halifax. The project includes replacement of aging wastewater and stormwater trunk sewers on Lady Hammond Road to facilitate the installation of the NEF. The project will also include all reinstatement required to restore the road surface for the infrastructure noted above.
The purpose of BCSF is to support the federal government’s commitment to improve the quality of life of people living in Canada by creating jobs and economic growth, supporting climate resilience, and building a stronger and more inclusive Canada. Through the BCSF, Housing, Infrastructure and Communities Canada (HICC) will collaborate with all levels of government,
Indigenous partners, and other stakeholders to deliver world-class, modern public infrastructure that will enable economic prosperity, housing, education, health, climate adaptation and community resilience.