Grants and Contributions:
Title:
Construction of a Multi-use Pathway on the Extension of Léo Street in Sainte-Catherine
Agreement Number:
-
Agreement Value:
$910,500.00
Agreement Date:
Aug 22, 2024 - Mar 31, 2026
Description:
The construction of the multi-use pathway is part of the construction of a new boulevard on Léo street to provide residents a new link between Highway 132 and Saint-Laurent boulevard. The future multi-use pathway will be roughly 855 m long. The project includes a walking and cycling path, a vegetated area (grass, trees, and shrubs) for stormwater retention, and street curbs. It also includes two crosswalks to the future transit terminal at the corner of Léo Street and Highway 132, street furniture (benches and trash cans), streetlights (41), and six crosswalks between the three proposed plazas. Pavement markings and signage will be included in the project to guide vulnerable users and keep them safe. The project is currently in the design phase, with construction scheduled for 2023.
Organization:
Infrastructure Canada
Location:
Sainte-Catherine, City/Town of, Quebec, CA
Reference Number:
278-2024-2025-Q2-00027
Agreement Type:
Contribution
Report Type:
Grants and Contributions
Additional Information:
Multi-year award for fiscal years 2024-25 to 2025-26.
Recipient's Legal Name:
Sainte-Catherine, City/Town of
Program:
Active Transportation Fund