Grants and Contributions:
Projects investment in risk assessment, flood mapping, mitigation planning, and small-scale infrastructure that will increase resiliency towards flooding events.
File Number: C5-7006-00
This Amendment is to terminate three projects that withdrew following signature of the Original Agreement:
• Mattagami Region Conservation Authority “Flood Erosion Hazard Mitigation”
• North Bay-Mattawa Conservation Authority “La Vase River and Cooks Creek Floodplain Mapping Update”
• Otonabee Region Conservation Authority “Flood Forecasting and Warning System Strategic Design and Tactical Plan” PS funding decreased from $7,758,276.24 to $7,519,026.24 for cycle 5 projects.
The NDMP addresses rising flood risks and costs, and builds the foundation for informed mitigation investments that could reduce, or even negate, the effects of flood events.
The NDMP fills a critical gap in Canada's ability to effectively mitigate, prepare for, respond to, and recover from, flood-related events by building a body of knowledge on flood risks in Canada, and investing in foundational.