Open Government Portal
Delimitation of the electoral districts for the 2021 elections in force since November 25, 2020.This third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Mapping of places and infrastructures administered by Quebec City and certain private institutions.This third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Following the execution of the forest work, the owners must, each year, prepare and submit to the Minister a Technical and Financial Activity Report (RATF) for each of the elements of the authorized annual programming (PRANA). The technical and financial activity report includes several geometric entities allowing the verification of development works on public forest land. Here is the list: forest roads, punctual infrastructure, drainage carried out, sample plot, intervention polygons, bridge and culvert, reforested species, intervention monitoring results, intervention sector, intervention monitoring sample unit.This third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Polygons representing runoff water retention basins at a resolution of one meter in order to identify the physical particularities of the territory. Runoff refers to the flow of rainwater at the soil surface that does not evaporate and does not seep into the ground when the water and vegetation retention capacity is reached. The [Climate Plan 2020-2030] (https://portail-m4s.s3.montreal.ca/pdf/Planclimat%2020-16-16-VF4VDM.pdf) aims, among other things, to improve planning and regulatory tools in urban planning. Montreal is committed to updating the climate change vulnerability analysis carried out as part of the 2015-2020 Montreal Agglomeration Climate Change Adaptation Plan and to integrate it into the …<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Saguenay City ZoningThis third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
City of Trois-Rivières flow control valveThis third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Imprint of all the buildings on the territory of the City of Repentigny.This third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Active and inactive boiling advisories from the City of Repentigny.This third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Delimitation of the urban perimeters of the City of RimouskiThis third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>
Bank of names dedicated to female representation to discover hundreds of women who have marked our history. Read the [process] (https://montreal.ca/toponymie/toponym-elles) that led to the name bank.This third party metadata element was translated using an automated translation tool (Amazon Translate).<span class="fa fa-language text-muted mrgn-lft-sm" title="This third party metadata element has been translated using an automated translation tool. To report any discrepancies please contact open-ouvert@tbs-sct.gc.ca"></span>