Open Government Portal
We are performing scheduled maintenance from 7:00 a.m. to 5:00 p.m. Eastern Time on Saturday, November 7, 2026.
About this information
Open data is defined as structured data that is machine-readable, freely shared, used and built on without restrictions.
The key things to remember about open data are:
- #Availability and access#: the data must be available as a whole and at no more than a reasonable reproduction cost, preferably by downloading over the internet. The data must also be available in a convenient and modifiable form.
- #Re-use and redistribution#: the data must be provided under terms that permit re-use and redistribution including the intermixing with other datasets.
- #Universal participation#: everyone must be able to use, re-use and redistribute. There should be no discrimination against fields of endeavour or against persons or groups. For example, 'non-commercial' restrictions that would prevent 'commercial' use, or restrictions of use for certain purposes (e.g. only in education), are not allowed.
The Carmacks flood hazard mapping study was completed between April 2023 and May 2024. Learn more by visiting the Yukon …
The Teslin flood hazard mapping study was completed between May 2023 and October 2024. Learn more by visiting the Yukon …
The Teslin flood hazard mapping study was completed between May 2023 and October 2024. Learn more by visiting the Yukon …
The Dawson City/Klondike Valley flood hazard mapping study was completed between May 2024 and March 2026. Learn more by visiting …
The Old Crow flood hazard mapping study was completed between April 2024 and May 2025. Learn more by visiting the …
The Upper Liard flood hazard mapping study was completed between May 2025 and March 2026. Learn more by visiting the …
The Southern Lakes flood hazard mapping study was completed between November 2022 and April 2024. Learn more by visiting the …
The Carmacks flood hazard mapping study was completed between April 2023 and May 2024. Learn more by visiting the Yukon …
The Old Crow flood hazard mapping study was completed between April 2024 and May 2025. Learn more by visiting the …
The Southern Lakes flood hazard mapping study was completed between November 2022 and April 2024. Learn more by visiting the …